BIM Mania - BIM & AEC Video Sharing Platform

CIVIL @ UL - Year 1 Design & Build Project 2015

105 Views
Added by Omare M.A. in Bridge Lectures

Thanks! Share it with your friends!

URL

You disliked this video. Thanks for the feedback!

Sorry, only registred users can create playlists.
URL


Description

As part of the CIVIL @ UL Year 1 Engineering Mechanics module, students were tasked with providing a safe means for a person to cross the KBS / Schuman Pond. Over 11 weeks students, in groups, rigorously designed bridge structures. In the final week, the bridges were assembled and tested before the being brought to the pond where Prof. Tom Cosgrove confidently strolled from one side of the pond to the other on a combination of four bridges (two cable-stayed bridges and two truss bridges).

Well done to all involved!


Note:
Audio track - Infected Mushroom (extra terra mix)

Post your comment

Sign in or sign up to post comments.

Comments

Be the first to comment